Telonic TEST

PLZ Series Easy Way to Expand Electronic Load Capacity in CV Mode

PLZ Series Easy Way to Expand Electronic Load Capacity in CV Mode

Our electronic load PLZ Series has a well-known feature that a master/slave parallel operation expands an output capacity in the same model, controlled slave units by a master unit (except for PLZ-4WL).
In this article, we are going to further explain how to increase the capacity by parallel connection with different models such as PLZ-5W Series (CV mode) and PLZ-4W Series.
How to Build Parallel System:
1. How to Operate PLZ-4W Series
Connect PLZ-4W to PLZ-5W in parallel and set PLZ-4W to CR or CC mode.
2. How to Connect
See Figure 1 for the example:

3. System Principle
Figure 2 shows the equivalent circuit of the above system. The red dotted line describes that the DUT and PLZ1205W are connected in parallel; PLZ1205W is in CV mode so that
PLZ1004W and the DUT should be in CC or CR operation to keep a stable operation. Note: In the example below, operating PLZ1004W in CP mode may cause an unstable operation.

4. Note
In the example above, it is necessary that PLZ1205W will not become a full load while controlling PLZ1004W; it depends on the DUT’s characteristics how to sink the current by PLZ1004W.

Products Mentioned In This Article:

Kikusui Electronic Loads please see HERE